Installation Overview Newsome has recently delivered the installation and commissioning of a new 400 kW chiller at a leading confectionery manufacturing site in York. This initiative demonstrates a notable step forward in the client’s ESG commitments, enhancing operational resilience and ensuring measurable reductions in both power usage and carbon output. https://bouchesocial.com/story22922348/energy-efficient-400-kw-chiller-installation-achieves-50-000-yearly-energy-savings-and-200-metric-tonnes-co%E2%82%82-cut